国产精品久久久在线观看_亚洲免费观看视频网站_国产盗摄视频一区二区三区_久久久国产一级 - 日本在线观看一区

歡迎來到寰標網! 客服QQ:772084082 加入會員
當前位置: 首頁 > 標準詳情頁

EN 1473:2021現行

Installation and equipment for liquefied natural gas - Design of onshore installations

出版:Comite Europeen de Normalisation

獲取原文 如何獲取原文?問客服 獲取原文,即可享受本標準狀態變更提醒服務!

專家解讀視頻

基本信息
標準編號: EN 1473:2021
出版單位:Comite Europeen de Normalisation
標準頁數:142
標準簡介

This document gives guidelines for the design, construction and operation of all onshore liquefied natural gas (LNG) installations for the liquefaction, storage, vaporization, transfer and handling of LNG and natural gas (NG). This document is applicable for plants with an LNG storage capacity above 200 t. The designated boundary limits are LNG inlet/outlet by the ship’s manifold including vapour return connection, the truck loading/unloading connection including vapour return, the rail car loading/unloading connection including vapour return and the natural gas in and outlet boundary by piping systems. Terminals or plant types have one or more boundary limits as described in this scope (see Figure 1). A short description of each of these installations is given in Annex G. Feed gas for LNG liquefaction installations (plant) can be from gas field, associated gas from oil field, piped gas from transportation grid or from renewables. Floating solutions (for example FPSO, FSRU, SRV), whether off-shore or near-shore, are not covered by this document even if some concepts, principles or recommendations could be applied. However, in case of berthed FSRU with LNG transfer across the jetty, the following recommendations apply for the jetty and topside facilities. In case of solutions using floating storage unit (FSU) and land-based re-gasification solution, the on-shore part is covered by these standard recommendations. Plants with a storage inventory from 5 t up to 200 t are covered by [5].

本標準替代的舊標準

EN 1473:2016