Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
出版:International Electrotechnical Committee

專家解讀視頻
defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.
OVE/ONORM EN 62381:2007 - Identical
PN EN 62381:2007 - Identical
NEN EN IEC 62381:2007 - Identical
I.S. EN 62381:2007 - Identical
DIN EN 62381 (2007-09) - Identical
BS EN 62381:2007 - Identical
CEI EN 62381 Ed. 1 (2007) - Identical